Appendix A. Acceptance Test Procedure
61185001L1-1 MX2810 M13 User Manual A-17
MX2810 ATP CHECKLIST/SIGN-OFF
Use the table below to identify the MX2810 configuration, identify tests
performed, etc.
Acceptance Test Procedure Steps Completed
Verification of Installed Configuration (identify the installed configuration)
Dual Power Supplies / Dual Power Feeds
Dual Power Supplies / Single Power Feed
Single Power Supply / Dual Power Feeds
Single Power Supply / Single Power Feed
Dual Controllers
Single Controller
Configuring the MX2810 for Test
Accessing the Craft Port
Provisioning the DS3 Port
Provisioning the DS1 Ports
Alarm Relay Configuration
Overall System and Cabling Test
Test Access Module / Streaker Test
DS1 to DS3 “Head to Head” Test
DS1 Daisy-chain to DS3 (hard) Loopback
DS1 to DS3 (hard) Loopback
Alarm Verification
Critical Alarm Relay Test
Major Alarm Relay Test
Minor Alarm Relay Test
Power Supply Redundancy Test
Redundancy tests (Power Supply and Power Feed as appropriate)
Controller Card Redundancy Test
Protection switching test
Configuring the MX2810 for Remote Access
Remote accessibility
Autonomous alarm reporting
Restoration of Default Settings
Additional Tests (document additional tests/checks performed below)
1. Autonomous alarm reporting (e.g., NMA)
2.
3.
Final System Configuration (Traffic Readiness)
NAME: DATE:
LOCATION: RELAY RACK:
Comentarios a estos manuales