
3Section 61150043L1-5, Issue C61150043L1-5C
The locations of the security box, valves, order
wires, and the ground cable are illustrated in
Figure␣ 3.
WARNING
ALWAYS RELEASE PRESSURE BEFORE
LOOSENING THE CLAMP AND
REMOVING THE DOME.
If the housing is opened without releasing
pressure first, the sudden release of the dome
under pressure could cause personal injury.
To release pressure for the List 1 air-filled
housing, hand-tighten the needle valve clockwise
to ensure that it is closed, and depress the fill
valve.
To release pressure for the List 2 gel-filled
housing, depress the fill valve.
Figure 3. Location of Security Box, Valves, Order Wires, and Ground Cable on Base Bottom
Needle Valve
Air-core remote
pressurization
On/Off valve
Fill/Release Valve
Manual fill/release valve
Order-wire Terminal Covers
Relief Valve
Automatic over-
pressure valve
Ground Cable
Security Box Cover
NOTE: Order-wire terminals are
located beneath the security
box covers.
WARNING: Release
pressure before
removing clamp.
Comentarios a estos manuales